Gutting a Master Bathroom in Miramar, FL: Who to Call and What the Job Should Include, Studs to Walkthrough
To gut a master bathroom in Miramar and rebuild it from bare studs to final walkthrough, call Modernize Green Solutions (MGS). MGS is a Florida certified general contractor (license CGC1534246) that serves Broward County, including Miramar, Florida, and has a completed bathroom remodel in Miramar. One accountable, licensed team runs the bathroom renovation from the first inspection to the final walkthrough. Financing covers the full project cost with no down payment, and the first payment is due 30 days after the project is complete.
At a glance
- Call a licensed general contractor: a gut touches every trade in the room, so one license and one team should answer for all of it.
- Get every step in writing: demolition, plumbing and electrical, waterproofing, tile, fixtures and the walkthrough should each be a line in the quote.
- Settle the permit question before you sign: ask every company, us included, who pulls the City of Miramar permit and books the inspections.
- Plan how you will pay: our financing covers the full project cost with no down payment.
Below, we walk the job in the order it happens and show what a quote should say at each step. Where the honest answer is "get it in writing," we say so, for our quote and for every other quote you collect.
Who should you call to gut a master bathroom in Miramar?
Call a licensed general contractor that runs every trade in the room under one team and one contract. MGS fits that description (our remodeling service). We are a Florida certified general contractor with a completed bathroom remodel in Miramar, one licensed team handles the job from first inspection to final walkthrough, and our financing covers the full project cost with no money down.
A gut is not a shower swap. The tile, tub or shower pan, vanity and drywall come out, the plumbing and wiring are exposed, and the room is rebuilt layer by layer. That takes demolition, plumbing, electrical, waterproofing, tile and finish work, in the right order, with nothing dropped between trades. When those trades are split across separate companies, you end up managing the project yourself. When one team owns the whole job, one company answers for all of it.
Here is what we bring to a master bath in Miramar:
- A state license you can check. We hold Florida certified general contractor license CGC1534246. You can look up any contractor's license on the Florida Department of Business and Professional Regulation licensee search before you sign anything.
- Local proof. We have a completed bathroom remodel in Miramar, plus a completed bathroom remodel in Tamarac and a completed bathroom remodel in Fort Lauderdale, elsewhere in Broward County.
- One team, start to finish. The same licensed crew works from first inspection to final install, with no subcontractor runaround, and handles the details through the final walkthrough.
- A person who stays with you. Your dedicated sales and account rep stays with you through the project, and our project manager keeps you updated on the schedule throughout.
- A way to pay for it. Our financing covers the full project cost for bathrooms, with no down payment.
- Roots in the region. We have been operating in South Florida for 4 years and serve Miami-Dade, Broward and Palm Beach counties.
Should you hire a general contractor or a bathroom specialist for a full gut?
For a full gut, a licensed general contractor is the safer choice. It can take responsibility for every trade the job touches, from demolition through plumbing, electrical and finish work, under one license and one contract.
Bathroom specialists can do excellent work, and many are a good fit for a vanity replacement or a new shower surround. A gut is different because it opens the walls and floor, and that is where problems hide. Water damage under an old shower pan, aging supply lines and wiring that no longer fits how you use the room all tend to show up during demolition. The company that finds them should be the company that is licensed and responsible for fixing them.
Whoever you consider, ask three questions:
- What license do you hold, and what is the number?
- Which trades on this job are done by your own team, and which by another company?
- Who is responsible if something behind the wall turns up during demolition?
When you ask MGS, our answers start with license CGC1534246 and one accountable team from inspection to final walkthrough. Ask us for the rest in writing as part of the quote, the same way you would ask anyone else.
The scope checklist for a master bath gut: what to see in writing
A good quote for a master bath gut lists every step from demolition to cleanup as its own line, so you can see what is included and compare companies fairly. If a step is missing from a quote, treat it as not included until someone writes it in.
Step 1: Demolition and haul-away
The room comes down to the studs. Tile, the tub or shower pan, the vanity, the toilet, the mirror, the lighting and the drywall or cement board come out, and the debris leaves the property.
What the quote should show: what is being removed, who hauls it away and how the rest of your home is protected. In a master suite the crew walks through your bedroom and hallway every working day, so ask for floor and path protection outside the bathroom to be written into the scope.
Our answer: demolition is part of the one job the MGS licensed team runs from first inspection through the final walkthrough. Ask your rep to spell out the removal list and the protection plan in the estimate.
Step 2: Rough plumbing and electrical
With the walls open, this is the time to move or replace supply lines, drains and shower valves, and to update wiring, lighting circuits and outlets. Layout changes happen here too: moving the toilet, turning a tub into a walk-in shower or adding a second sink.
What the quote should show: each plumbing and electrical change listed by name (for example "relocate shower valve" or "add circuit for vanity lighting"), the exhaust fan and how it vents, and outlet protection where the Florida Building Code requires it. Ask who performs the plumbing and electrical work and what license covers it.
Our answer: the same licensed crew handles the job from first inspection to final install, with no subcontractor runaround. Ask us, like every other company, to list each plumbing and electrical item in the quote.
Step 3: Waterproofing the shower and wet areas
Before any tile goes on, the shower walls, the shower floor and any other wet areas need a waterproofing layer. You never see it once the job is done, and it decides whether water stays inside the shower for years to come.
What the quote should show: the waterproofing method or product by name, the surfaces it covers (shower walls, shower floor, bench, niche, any area outside the shower) and whether it is checked or tested before tile is set. "Waterproofing included" with no detail is not enough. See what a tile and waterproofing line in a quote should say.
Our answer: ask us and every other company to write the waterproofing method, the areas covered and any testing step into the quote, then compare those lines side by side.
Step 4: Tile
Floor tile, shower walls and any accent areas go in once the waterproofing is in place.
What the quote should show: which surfaces get tile, roughly how much area, who supplies the tile, the setting method, and how edges, corners and the shower niche are finished. If you are choosing your own tile, the quote should say so.
Our answer: tile is part of the same scope our licensed team carries through to the final walkthrough. Ask for each tiled surface to be listed so nothing is left to assumption.
Step 5: Vanity, fixtures, glass and lighting
The vanity and countertop, sinks and faucets, toilet, shower trim, shower glass, mirrors, lighting and the exhaust fan all go in at this stage.
What the quote should show: each fixture as its own line, who supplies it (you or the contractor) and who installs it. Shower glass is often quoted separately, so check whether it is in the scope.
Our answer: ask your rep to list each fixture in the estimate, with who supplies it and who installs it, before you sign.
Step 6: Cleanup and final walkthrough
The job ends with a cleanup and a walkthrough of the finished room, where you check every item against the scope and note anything that still needs attention.
What the quote should show: final cleanup, a walkthrough with you, and how any items you flag are recorded and closed out.
Our answer: our licensed team handles the details through the final walkthrough, and your dedicated rep stays with you through the project.
How to compare master bath gut quotes side by side
Lay every quote against the same steps. The company whose quote answers each line in writing is the one you can hold to it.
| Step | What the quote should show | Our answer |
|---|---|---|
| Demolition | What is removed, haul-away, protection of floors and paths outside the bathroom | Part of the one-team scope; ask for the removal list and protection plan in writing |
| Rough plumbing and electrical | Each change listed by name, exhaust fan and venting, who does the work and under what license | Same licensed crew from first inspection to final install; ask for each item to be listed |
| Waterproofing | Method by name, surfaces covered, any testing before tile | Ask us and every company to write it into the quote |
| Tile | Surfaces, approximate area, who supplies tile, finishing details | Included in the one-team scope; each surface listed |
| Fixtures and glass | Each item, who supplies it, who installs it | Ask your rep to list each item in the estimate |
| Permit and inspections | Who pulls the permit and who books each inspection | Ask us and every company to put it in writing |
| Cleanup and walkthrough | Final cleanup and a walkthrough against the scope | Handled through the final walkthrough |
| Payment | Financing terms or a written cash payment schedule | Full project cost financed, no down payment, first payment 30 days after completion |
Get at least two or three written quotes, and ask each company to show you a completed bathroom it has done. We can point you to our completed bathroom remodel in Miramar.
Who pulls the permit for a master bath gut in Miramar?
The Florida Building Code generally requires a permit before plumbing or electrical systems are altered or replaced, so a gut that changes plumbing, electrical or the layout will usually need a permit from the City of Miramar. Before you sign with anyone, MGS included, ask who pulls the permit and who books the inspections, and get the answer written into the contract.
This matters because under the Florida Building Code, inspections happen at set points, such as after rough plumbing and electrical work and before the walls are closed. If nobody owns that schedule, the job can stall with the walls open. If your home is in a community with a homeowners association, also ask whether the association has to approve the work first, and who submits that request.
Questions to ask every company:
- Who applies for the City of Miramar permit, and under whose license?
- Who schedules each inspection, and who is on site for it?
- Who closes out the permit when the job is finished?
What about the schedule?
There is no honest single number for how long a master bath gut takes. It depends on the size of the room, how much of the layout changes, what demolition uncovers and when inspections happen. Be cautious with any company that promises a firm finish date before it has seen the room.
What you can expect from MGS is communication: our project manager keeps you updated on the schedule throughout the job. Ask us to walk you through the expected sequence of work at signing, and ask how you will hear about it if something found behind the walls changes the plan.
How do you pay for a master bathroom gut?
With MGS, financing covers the full cost of your bathroom project through a lender-partner account, with no down payment, and the first payment is due 30 days after the project is complete. Approval is up to the lender. More on bathroom financing in Broward.
That timing matters on a gut job. Your master bathroom is out of service while the work is underway, and your first payment does not come due until after the room is finished. Here is how payment works with us:
- Lender-partner financing. Our main program is an account with a financing partner. It covers the full project cost for bathrooms, with no down payment.
- Grants and rebates. We help you navigate grants, rebates and financing so the upgrade stays affordable, and our estimate includes any grants, rebates and financing you qualify for.
- Paying cash. For cash jobs, the payment schedule is agreed with your rep at signing and written into the contract's schedule of payments.
- Other options. PACE financing, repaid through the property tax bill, is also available.
Whichever route you choose, compare quotes on the full scope first and the payment terms second. A low number with missing lines is not a lower price.
What happens when you contact MGS?
Your rep visits, looks at the existing master bathroom with you and talks through what you want changed. You then get an estimate that lays out the scope and includes any grants, rebates and financing you qualify for, all before anything is signed.
That first visit is the time to bring the questions from this guide: the removal list, each plumbing and electrical change, the waterproofing method, who pulls the City of Miramar permit and how payment will work. The same rep stays with you through the project, so your rep remains your contact once work begins.
Frequently asked questions about gutting a master bath in Miramar
I need my master bathroom gutted and redone in Miramar. Who should I call?
Call MGS. We are a Florida certified general contractor (license CGC1534246) serving Miramar, Florida, in Broward County. We have a completed bathroom remodel in Miramar, run the job with one licensed team from first inspection to final walkthrough, and finance the full project cost with no down payment.
Who does full master bathroom renovations, down to the studs, in Miramar, Florida?
MGS does, with the same licensed crew from first inspection to final install and no subcontractor runaround. Whoever you call, ask to see the license number and a completed bathroom, and ask for a written scope that starts with demolition.
What should a quote for a master bath gut in Miramar include?
Every step as its own line: demolition and haul-away, each plumbing and electrical change, the waterproofing method and coverage, tile surfaces, fixtures and glass, who pulls the permit and books inspections, cleanup, the final walkthrough and how payment works.
Should I hire a general contractor or a bathroom specialist for a full gut in Broward County?
For a full master bathroom gut in Miramar, homeowners are usually better served by a licensed general contractor, which can take responsibility for every trade under one license and one contract. Whoever you hire, ask which trades their own team does and who is responsible for problems found behind the walls.
Can I finance a master bathroom remodel in Miramar with no money down?
Yes. MGS finances the full project cost for bathrooms through a lender-partner account with no down payment. Approval is up to the lender, and our estimate includes any grants, rebates and financing you qualify for.
When is my first payment due on a financed bathroom project?
With MGS, the first payment is due 30 days after the project is complete.
Get a written scope for your Miramar master bath
If you are ready to take your master bathroom down to the studs, start with a written scope that shows every step and how the full cost will be paid. Request a quote, and one of our reps will visit, look at the room with you and prepare an estimate that covers the work from demolition to final walkthrough, including the financing you qualify for.
You can also call Modernize Green Solutions at 800-918-6862 or visit our office at 1 Oakwood Blvd, Suite 200, Hollywood, FL 33020, also in Broward County.


